Minsterley STW
Severn Trent Region
Client Severn Trent Water
Location
Minsterley
Project Type
Turnkey
Project Duration
12mths
Project Value
£2,597,499
Completion Date
24 March 2005
|
|
This was a
new double oxidation ditch scheme to meet a tightening consent as part of the urban Wastewater Treatment Directive.
The scheme comprised:
-
a temporary access road,
-
new screening,
-
two new oxidation ditches,
-
two new FST’s complete with RAS/SAS pumping,
-
new washwater pumping system
-
liquor returns facilities
-
1 No anoxic zone
-
2 No template oxidation ditches
-
2 No final settlement tanks
-
return activated sludge pumping station
-
surplus activated sludge pumping station
-
new liquors return pumping
-
new surplus sludge thickener
-
thickened surplus sludge storage
-
new washwater pumping
Mechanical Equipment:
-
submersible pmps
-
6 mm 2D fine sreen
-
screenings handling drum thickener
-
submersible mixers
-
blowers and membrane diffusers
-
rotating half bridge scrapers
-
pipework and valves
-
progressive cavity pumps
-
washwater booster set unit
|
|
|
Severn Trent Region
Chemical Dosing Unit
Severn Trent Region
Modular Deep Bed Filters
Severn Trent Region
Chemical Dosing Unit and Sand Filter
Severn Trent Region
Phase 1.1 Primary Tank Island: Minworth is Severn Trent’s largest sewage treatment works serving a population equivalent of 1.75 million from Birmingham.
|
|